Zellige Tile Installation Guidelines
When properly installed, zellige tile creates a beautiful, durable, and easy-to-maintain surface that can be enjoyed for many years. These instructions are provided as general installation guidelines. Always follow the current instructions provided by the manufacturers of the setting materials, grout, waterproofing products, sealers, and other installation products being used, as well as applicable building codes and industry standards. Cement Tile Shop is not responsible for improper installation, product misuse, or jobsite-specific conditions, or for material after it has been cut or installed.
We recommend consulting a qualified professional installer or contractor regarding the requirements of your particular project. Before beginning installation, make sure you and your installer have reviewed these recommendations in full. Proper installation and suitability of the selected installation system for the project are the responsibility of the installer and purchaser.
Freeze–Thaw Exposure
Traditional handmade zellige tile has not been tested or certified by Cement Tile Shop for freeze–thaw resistance. Because moisture can be absorbed into the clay body, zellige is not recommended for exterior installations exposed to freezing and thawing conditions. Glazing, sealing, waterproofing, or specialized setting materials do not establish freeze–thaw suitability.
Breeze Block Installation Guidelines
For decorative, non-load-bearing screens and partitions. These instructions help you plan and install Cement Tile Shop breeze blocks. The support system, wall dimensions and connections must be designed for the particular location and application before work begins.
Important: Breeze blocks do not carry building loads and must not serve as a guardrail, retaining wall, or a surface intended for sitting, standing or climbing. Exterior and freestanding walls must resist wind and other applicable lateral loads. Do not use these blocks where they will be exposed to freeze-thaw cycles. Have a qualified design professional determine the required foundation or frame, supports, anchorage, reinforcement, movement joints and any openings. Confirm permit and code requirements with the local authority. These general instructions do not establish a safe maximum wall height or length.
The printable guides include conceptual diagrams of a breeze block panel and block preparation. These illustrations are not engineered construction drawings. A qualified design professional must provide the project-specific support, anchorage, reinforcement and wind-load details.